Skip to content

Services · ADA / Accessibility Upgrades

ADA / Accessibility Upgrades

We make homes and small commercial spaces more accessible: ramps, doorway widening, grab bars, curbless showers, reachable fixtures, and kitchen/bath modifications. We handle drawings, permits, and clean builds that respect timelines and budgets.

Wheelchair ramp with continuous handrails to an accessible entry
Accessible bath with roll-in shower and grab bars

Typical scope

  • Wheelchair ramps (front, rear, or garage access)
  • Doorway widening & threshold transitions
  • Grab bars & backing at proper heights
  • Roll-in/curbless showers, handheld valves, non-slip tile
  • Lever handles, reachable switches/outlets, knee-clearance sinks
  • Stair & handrail upgrades, platform lift coordination
  • Plans, permits, and inspection coordination

Timeline

Permits (where required) ~2–6 weeks depending on the city queue and scope; builds typically ~1–4 weeks.

Start an accessibility project →